Siwa and Habata power plant

...

Project Scope:

  • Mechanical and electrical works installation for diesel engine 2*4 MW for Siwa & 2*4 MW for habata

Main contractor: EMC
Project Date: 2019


BORG AL ARAB POWER PLANT II EXTENSION 2X10 MW GAS ENGINE

...

...

...

Client: NATIONAL ELECTRICITY TECHNOLOGY CO. “KAHRAB
Project Scope:
All mechanical and electrical works installation for 2x10 MW Gas engine system by all system until successful operation (Wartsila 20V34SG-D gas engine).
Project Date: 2020


Deshna Diesel PROJECT

...


Project Scope:

  • The project executed in two phases. First phase includes dismantle of two diesel engines complete with its auxiliaries from Deshna City, Egypt.
  • Second phase include installation of these two engines with its dismantled auxiliaries at cement plant located at Chad.
  • NCS performed all related works, including but not limited to: Phase 1: - Dismantle, packing, coding, loading, electrical equipment dismantles, mechanical equipment dismantles, associated systems and equipment, preparation of croquet drawings, technical documents and all dismantle services associated with the equipment that to be dismantled
  • within the scope of work, and all works are to be complied with all safety requirements and applicable standards.

Project Date:2020


AL FARAFRA DIESEL POWER STATION 4×4 MW

...

...

...

...

Project Scope:

  • All mechanical and electrical works installation for 4x4 MW diesel system by all system until successful operation
  • NCS performed all related works, including but not limited to:
    A. Diesel engine sets
    B. Fuel system .
    C. Lube oil system
    D. Exhaust system.
    E. Air intake system
    F. Cooling system
    G. Engine starting system

MAIN CONTRACTOR: EMC Energy
Project Date: 2015-2016


EL-Dekhala DIESEL POWER STATION 3×4 MW (Gas engine system)

...

Project Scope:

  • • All mechanical and electrical works installation for 3x4 MW Gas engine system
  • NCS performed all related works, including but not limited to:
    • Lube oil system
    • Exhaust system.
    • Compressed air system.
    • Cooling water system
    • Ventalation.
    • Installing of MV,LV and control panels.
    • Installing cable tray , cable supports and cabel ending.
    • MV cabels laving and termenation.
    • LV cabels laving and termenation.
    • DC System bettery and bettery charge.
    • Lighiting system.
    • Earting and lightining system.

MAIN CONTRACTOR: EMC Energy
Project Date:2010-2011