Siwa and Habata power plant
...
Project Scope:
- Mechanical and electrical works installation for diesel engine 2*4 MW for Siwa & 2*4 MW for habata
Main contractor: EMC
Project Date: 2019
BORG AL ARAB POWER PLANT II EXTENSION 2X10 MW GAS ENGINE
...
...
...
Client: NATIONAL ELECTRICITY TECHNOLOGY CO. “KAHRAB
Project Scope:
All mechanical and electrical works installation for 2x10 MW Gas engine system by all system until successful operation (Wartsila 20V34SG-D gas engine).
Project Date: 2020
Deshna Diesel PROJECT
...
Project Scope:
- The project executed in two phases. First phase includes dismantle of two diesel engines complete with its auxiliaries from Deshna City, Egypt.
- Second phase include installation of these two engines with its dismantled auxiliaries at cement plant located at Chad.
- NCS performed all related works, including but not limited to: Phase 1: - Dismantle, packing, coding, loading, electrical equipment dismantles, mechanical equipment dismantles, associated systems and equipment, preparation of croquet drawings, technical documents and all dismantle services associated with the equipment that to be dismantled
- within the scope of work, and all works are to be complied with all safety requirements and applicable standards.
Project Date:2020
AL FARAFRA DIESEL POWER STATION 4×4 MW
...
...
...
...
Project Scope:
- All mechanical and electrical works installation for 4x4 MW diesel system by all system until successful operation
- NCS performed all related works, including but not limited to:
A. Diesel engine sets
B. Fuel system .
C. Lube oil system
D. Exhaust system.
E. Air intake system
F. Cooling system
G. Engine starting system
MAIN CONTRACTOR: EMC Energy
Project Date: 2015-2016
EL-Dekhala DIESEL POWER STATION 3×4 MW (Gas engine system)
...
Project Scope:
- • All mechanical and electrical works installation for 3x4 MW Gas engine system
- NCS performed all related works, including but not limited to:
• Lube oil system
• Exhaust system.
• Compressed air system.
• Cooling water system
• Ventalation.
• Installing of MV,LV and control panels.
• Installing cable tray , cable supports and cabel ending.
• MV cabels laving and termenation.
• LV cabels laving and termenation.
• DC System bettery and bettery charge.
• Lighiting system.
• Earting and lightining system.
MAIN CONTRACTOR: EMC Energy
Project Date:2010-2011