Abu Qir Fertilizer Company (AFC)
...
Client: Mitsubishi Power Europe GmbH
Project Scope:
• Replacement of the complete bottom tubes of the package boiler
Project Date: 2020
Cairo west thermal power station
...
...
...
Client: Ministry of electricity and energy-Cairo electricity production company (CEPC)
Project Scope:
• Full Rehabilitation at boiler (5&6).
NCS performed all related works, including but not limited to:
• Rehabilitation of Economizer at boiler (5&6) including inlet header for economizer
- Rehabilitation of (PSH) from both sides (LT&HT) including inlet header for (PSH) at boiler (5&6).
- Rehabilitation of (RH) from both sides (LT&HT) including inlet header for (RH) at boiler (5&6).
- Rehabilitation of water wall up to level 22m at boiler (5&6).
- Rehabilitation of attemperators for super heater and reheat at boiler (5&6).
- Rehabilitation of steam air heaters at boiler (5&6)
- Rehabilitation of gas air preheater at boiler (6).
- Refectory and insulation work.
Project Date: 2019 - 2020
Abo Qir power station
...
Client: West delta electricity Production Company
Project Scope:
• Full Rehabilitation at boiler No. 2
Project Date: 2018
Assiut (El-Walidia) Thermal Power Plant
...
...
Client: Upper Egypt Electricity Production Company
Main Contractor: MHI / TTC (Mitsubishi Heavy Industrials / Toyota Tsusho Corporation)
Project Scope:
• Rehabilitation Activities
Project Date: 2015
(El-Walidia) Thermal Power Plant
...
Client: Upper Egypt Electricity Production Company
Project Scope:
• Rehabilitation of two Gas preheaters
(A.B) in unit No. 1
Project Date: 2013
Shobra El-Khima Thermal Power Station (4*325MW)
...
...
...
Client: Cairo Electricity Production Company
Project Scope:
Rehabilitation of SH3, Furnace Water Wall Panels at boiler unit no (1) unit No. (4)
• Rehabilitation of Gas preheater A
Project Date: 2014
Al-Ain Al-Sokhna Supercritical thermal power plant (2*650MW) Boiler Unit (1), (2)
...
...
Client: East Delta Electricity Production Company.
Project Scope:
• Piping of inlet, outlet of secondary & final superheater as well as inlet& outlet for final reheater boiler unit (2)
• Re heater & Super heater coils water wall tubes, down comers & Fuel oil system unit (1).
Project Date: 2012 - 2013
Cairo West Thermal Power Station
Client: Ministry of Electricity and Energy – Cairo Electricity Production Company (CEPC)
Project Scope:
• Rehabilitation of final SH&RH1 at boiler unit (5)
• Rehabilitation of final SH&RH1 at boiler unit (6)
West Damietta Gas Turbine Power Station (4*125)
...
...
Client: East Delta Electricity Production Company Production Company (EDEPCO).
Project Scope:
• Fabrication and Erection of piping for two units
Project Date: 2020
BORG AL ARAB POWER PLANT II EXTENSION 2X10 MW GAS ENGINE
...
Client: NATIONAL ELECTRICITY TECHNOLOGY CO. “KAHRAB
Project Scope:
All mechanical and electrical works installation for 2x10 MW Gas engine system by all system until successful operation (Wartsila 20V34SG-D gas engine).
Project Date: 2020