Helwan Cement - Installation of 4PH boilers
...
Project Scope:
- 4 PH Boilers mechanical & piping erection, Include all steel structures erection, insulation, painting, NDT and PWHT work.
- Pipe rack erection (Steel structures & piping).
- Steam turbine mechanical & piping erection, insulation, painting, NDT and PWHT work.
- Water treatment plant (WTP) mechanical & piping erection, insulation, painting, NDT and PWHT work.
Client: Helwan Cement
Project Date: 2023
One ninety development project-District cooling plant
...
Client: EMC Energy
Project Scope:
• Mechanical & piping erection for 4 chillers, 4 cooling towers & pumps
Project Date: 2023
Irrigation pipes installation at Bani Suief project
...
Client: EL-Sewedy electric infrastructure.
Project Scope:
- Installation, welding, painting into place of welding, insulation and testing of irrigation pipes 2200 mm diameter at Bani Suief project
- Total length executed is 21,000 km
Project Date:2022
Irrigation pipes installation at Mostakebal Misr project
...
Project Scope:
- Installation, welding, painting into place of welding, insulation and testing of irrigation pipes 2500 mm diameter at Mostakbel Misr project
- Total length executed is 60,000 km
Client: EL-Sewedy electric infrastructure
Project Date: 2022
Irrigation pipes installation at North Sina project project
...
Project Scope:
- Installation, welding, painting into place of welding, insulation and testing of irrigation pipes 2200 mm diameter at North Sina project project
- Total length executed from station 2 to 3 is 35,000 km & from station 3 to 4 is 24,000 km & from station 7 to 9 is 16,000 km , by total length 75,000 km
Client: EL-Sewedy electric infrastructure
Project Date:2021
Medium Density Fiberboard (MDF) Factory project
...
Project Scope:
- Installation of mechanical and electrical equipment at MDF factory project with total weight 3,000 ton
- Supply, fabrication and installation of local manufacture
Client: Nile wood S.A.E (Egyptian Kuit holding Company)
Project Date: 2021-2022
MIDOR project
...
Project Scope:
- Installation and welding of pipes different size and thickness
Client: Petrojet
Project Date: 2021
Installation of pump stations at Toshka project
...
Project Scope:
- Installation, welding and testing of pump stations
- Installation of 35 booster pump station by total 219 pumps
- Installation of 2 lifting pump station by total 18 pumps capacity of 3 million m3/day
- Included installation suction, discharge, header pipes, hammering system & priming system
Client: Madkour
Project Date: 2022